Planner fees
Fees calculates the fee of each planner on its own basis, with no reductions between planners.
- Planners: architect, construction management, civil, electrical, HVAC and sanitary engineers, landscape architect, building physics, fire safety, surveyor, geologist and other specialists.
- Methods: SIA tariff, percentage of a basis, lump sum, or hours times rate, chosen per planner.
- Architect: the SIA 102 fee from the cost-determining construction costs, entered as one figure or taken over from Costs, with the phase split and every factor sourced.
- Totals: ancillary costs and a final discount on the subtotal.
A fee can replace the proxy value at its BKP code in Costs.
Frequently asked questions
Is the fee a binding offer?
No. It is a planning aid that shows every factor and its source.